Loganholme WWTP

Sustainable sewage sludge drying

03.02.2026 Published on 03.02.2026 1 min

Client: Downer / Loganholme

Completion: 2022

Technology: ELODRY®

Size: 600 kgDS/h

Scope of delivery and services

  • Engineering, supply, installation and commissioning of the complete sludge drying plant
  • Implementation of the sludge utilization plant in the wastewater treatment plant with optimal thermal efficiency

Special features

  • Required electricity of ELODRY® ≤ 40 kWh/t H2Ovapor
  • Required heat demand of ELODRY® ≤ 800 kWh/t H2Ovapor
  •  –
  •  –
  •  –